Back to Search
Start Over
R&D Activities Regarding ITER Blanket First Wall in Korea
- Source :
- Fusion Science and Technology. 62:21-28
- Publication Year :
- 2012
- Publisher :
- Informa UK Limited, 2012.
-
Abstract
- Korea Domestic Agency (KO-DA) was responsible for the procurement of the ITER blanket modules 1, 2, and 6 in the original procurement allocation. According to the procurement reallocation of the blanket system, Korea will procure the blanket shield block in place of the blanket first wall. Nevertheless, several R&D activities in Korea have been performed including optimization of the hot isostatic pressing (HIP) bonding process between Be/CuCrZr and CuCrZr/SS, the nondestructive test method, fabrication feasibility study, high heat flux tests, and design analysis. Especially, KO-DA participated in the qualification program for the mock-up manufacture and high heat flux tests. Several mock-ups were fabricated and tested during the qualification program. The details of the mock-up manufacture and test results are described in this paper. Also, two heat flux facilities were installed based on the graphite heating, and a new electron beam heat flux facility will be built in the near future for the enh...
- Subjects :
- Bonding process
Nuclear and High Energy Physics
Design analysis
020209 energy
Mechanical Engineering
Nuclear engineering
02 engineering and technology
Test method
Blanket
01 natural sciences
010305 fluids & plasmas
Procurement
Nuclear Energy and Engineering
Heat flux
Hot isostatic pressing
Shield
0103 physical sciences
0202 electrical engineering, electronic engineering, information engineering
Environmental science
General Materials Science
Civil and Structural Engineering
Subjects
Details
- ISSN :
- 19437641 and 15361055
- Volume :
- 62
- Database :
- OpenAIRE
- Journal :
- Fusion Science and Technology
- Accession number :
- edsair.doi...........4abce4c6172b4df4ddc01b6f0a4f342b
- Full Text :
- https://doi.org/10.13182/fst12-a14106