Back to Search
Start Over
Petronius Project - Reservoir Characterization, Modelling, and Fluid-Flow Simulation
- Source :
- EAGE/AAPG 3rd Research Symposium - Developing and Managing Turbidite Reservoirs.
- Publication Year :
- 1998
- Publisher :
- European Association of Geoscientists & Engineers, 1998.
-
Abstract
- Oil and gas production from the Texaco-operated Petronius Compliant Tower will begin in early 1999. The field is located at Viosea Knoll Bloek 786 in 1750 feet of water. The Petronius Subsurface Development Team has employed fluid-flow simulation as the primary tooI for optimizing plans for development drilling and reservoir management.
Details
- Database :
- OpenAIRE
- Journal :
- EAGE/AAPG 3rd Research Symposium - Developing and Managing Turbidite Reservoirs
- Accession number :
- edsair.doi...........2e4f9059e8751bcbc8cacbe94595a3a8
- Full Text :
- https://doi.org/10.3997/2214-4609.201406571