Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates
- Source :
- International Journal of Production Research. 41:31-45
- Publication Year :
- 2003
- Publisher :
- Informa UK Limited, 2003.
-
Abstract
- We address the problem of releasing jobs to the factory floor while meeting delivery dates and minimizing the work-in-process inventory. Heuristic algorithms were developed that used an efficient, detailed shop-floor scheduling model to determine the release times of new jobs. The process starts with the current shop floor conditions and determines the sequencing of both in-process and new jobs on machines in order to minimize the maximum lateness (L max ). The approach is tractable for industrial-sized problems and provides solutions close to a calculated lower bound for WIP. Computational experience is given.
- Subjects :
- Factory floor
Engineering
Operations research
business.industry
Heuristic
Strategy and Management
Distributed computing
Scheduling (production processes)
Process (computing)
Flow shop scheduling
Management Science and Operations Research
Upper and lower bounds
Industrial and Manufacturing Engineering
business
Subjects
Details
- ISSN :
- 1366588X and 00207543
- Volume :
- 41
- Database :
- OpenAIRE
- Journal :
- International Journal of Production Research
- Accession number :
- edsair.doi...........2932e5161c0bce3ed5a4043e53272e0b