Radiation shielding requirements for the full power operation of the linear IFMIF prototype accelerator (LIPAc) at Rokkasho

Authors :
Hervé Dzitko
Francesco Scantamburlo
Keishi Sakamoto
Beatriz Brañas
Keitaro Kondo
Atsushi Kasugai
Dominique Gex
Philippe Cara
Masayoshi Sugimoto
Juan Knaster
Francisco Ogando
Source :
Fusion Engineering and Design. 146:293-298
Publication Year :
2019
Publisher :
Elsevier BV, 2019.

Abstract

The detailed shielding analysis has been performed in order to find a configuration of the radiation shielding in the accelerator building necessary for the operation of the Linear IFMIF Prototype Accelerator (LIPAc), which is under construction in Rokkasho, Japan, at the full power of 1.125 MW to satisfy the radiation dose limit prescribed by Japanese regulations. The final design of the beam dump constructed by CIEMAT, Spain was fully taken into consideration. The impact of all the features potentially causing neutron streaming were investigated and the optimization of local additional shieldings were conducted. As the result, the most important one was found to be the air ventilation duct shield, which completely covers the ducts and creates an additional labyrinth. By considering the additional shielding configuration determined in the present study, the legal criteria at the controlled area boundary can be completely satisfied.

Details

ISSN :
09203796
Volume :
146
Database :
OpenAIRE
Journal :
Fusion Engineering and Design
Accession number :
edsair.doi...........2549098b14c4bc4abc0f0436ed991a98
Full Text :
https://doi.org/10.1016/j.fusengdes.2018.12.049