Back to Search Start Over

Cold Test of S-band Re-entrant Cavity BPM for HLS

Authors :
Luo, Qing
Fang, Jia
He, Duohui
Sun, Bao-Gen
Publication Year :
2010
Publisher :
JACoW Publishing, Geneva, Switzerland, 2010.

Abstract

An s-band re-entrant cavity BPM system is designed for new high brightness injector at HLS. A prototype cavity BPM system was manufactured for off-line test, which is also called cold test. According to the results of computer simulation, wire scanning off-line test method can be used to calibrate the BPM and estimate the performance of the on-line BPM system. Cross-talk problem was detected during the cold test. Ignoring nonlinear effect, transformation matrix is a way to correct cross-talk. Analysis of cold test results showed that position resolution of prototype BPM is better than 3 μm.<br />Proceedings of the 1st International Particle Accelerator Conference, IPAC2010, Kyoto, Japan

Details

Language :
English
Database :
OpenAIRE
Accession number :
edsair.doi...........1e68b72a73488fe12b9abcf48d6c1151
Full Text :
https://doi.org/10.18429/jacow-ipac2010-mope029