Back to Search Start Over

Current and future operation scenarios for a 50,000 MWh district heating system

Authors :
Dino Bouchlaghem
Oliver Martin-Du Pan
Philip C. Eames
Gideon Susman
Paul Rowley
Source :
Architectural Engineering and Design Management. 11:280-304
Publication Year :
2014
Publisher :
Informa UK Limited, 2014.

Abstract

The performance of Pimlico District Heating Undertaking (PDHU), in London, with an annual heating load of 50,000 MWh was analysed throughout 2012. Half-hourly data for the system were investigated to determine the natural gas consumed, operation of the 2500 m3 accumulator, the two 1.6 MWe combined heat and power (CHP) engines, the three 8 MW boilers, the electricity import and export and the consumers' heat consumption. These data were used to characterise the current performance in detail, and an energy flow diagram for the system energy flows was generated. The modulating efficiencies of the boilers varied from 84% to 91%, whereas the CHP engines performed with a modulating near constant electrical efficiency of 40%, but with a thermal efficiency that decreases with higher load. The current operation of the plant is compared across 10 scenarios. These scenarios were compared while (i) using the accumulator more effectively to let the boilers operate at full load only and (ii) using the provided maintena...

Details

ISSN :
17527589 and 17452007
Volume :
11
Database :
OpenAIRE
Journal :
Architectural Engineering and Design Management
Accession number :
edsair.doi...........1abfb963bbf5b0fdfa01f53387594925
Full Text :
https://doi.org/10.1080/17452007.2014.899889