Back to Search Start Over

Dynamic project performance estimation by combining static estimation models with system dynamics

Authors :
KeungSik Choi
Doo-Hwan Bae
Source :
Information and Software Technology. 51:162-172
Publication Year :
2009
Publisher :
Elsevier BV, 2009.

Abstract

Changes in user requirements or project personnel occur frequently during project execution particularly in long-term and large-size projects. We need a tool which can estimate the effects of changing conditions to effectively manage the project. This paper proposes a simulation method for dynamic project performance in terms of effort, schedule, and defect density changes in a dynamic project environment by combining COCOMO II with system dynamics. We apply expert judgment technique to overcome the lack of empirical data on the effects of dynamic project environment. We develop a simulation tool (available on the authors' website) which has model adjustment parameters to reflect experts' estimation on project characteristics. The simulation experiment on a military application development project demonstrates that the developed model can show the behavioral characteristics of a project suffering unanticipated and uncontrolled requirements creep. This helps project managers understand interactions between project factors and proactively evaluate and control the effects of dynamic project environment.

Details

ISSN :
09505849
Volume :
51
Database :
OpenAIRE
Journal :
Information and Software Technology
Accession number :
edsair.doi...........11b65f52ca778c5d65d68c3e9b56f650
Full Text :
https://doi.org/10.1016/j.infsof.2008.03.001