Cite
Production scheduling in modular construction: Metaheuristics and future directions
MLA
Achini Peiris, et al. “Production Scheduling in Modular Construction: Metaheuristics and Future Directions.” Automation in Construction, vol. 150, June 2023, p. 104851. EBSCOhost, https://doi.org/10.1016/j.autcon.2023.104851.
APA
Achini Peiris, Felix Kin Peng Hui, Colin Duffield, & Tuan Ngo. (2023). Production scheduling in modular construction: Metaheuristics and future directions. Automation in Construction, 150, 104851. https://doi.org/10.1016/j.autcon.2023.104851
Chicago
Achini Peiris, Felix Kin Peng Hui, Colin Duffield, and Tuan Ngo. 2023. “Production Scheduling in Modular Construction: Metaheuristics and Future Directions.” Automation in Construction 150 (June): 104851. doi:10.1016/j.autcon.2023.104851.