Cesium Eluate Semi-Batch Evaporation Performance

Authors :
R.A. Pierce
Publication Year :
2003
Publisher :
Office of Scientific and Technical Information (OSTI), 2003.

Abstract

The baseline flowsheet for low activity waste (LAW) in the Hanford River Protection Project (RPP) Waste Treatment Plant (WTP) includes pretreatment of supernatant by removing cesium using ion exchange. When the ion exchange column is loaded, the cesium will be eluted with a 0.5M nitric acid (HNO3) solution to allow the column to be conditioned for re-use. The cesium eluate solution will then be concentrated in a vacuum evaporator to minimize storage volume and to recycle HNO3.