Back to Search Start Over

ROBOT TASK SCHEDULING IN A FLEXIBLE MANUFACTURING CELL

Authors :
Franklin W. Chafee
Russell E. King
Thom J. Hodgson
Source :
IIE Transactions. 25:80-87
Publication Year :
1993
Publisher :
Informa UK Limited, 1993.

Abstract

Effective sequencing and scheduling of the material handling system can have a major impact on the productivity of the manufacturing system. This is especially true in the case where material handling times are on par with machine processing times. In a dynamic, real-time environment, the optimal solution of this scheduling problem may be computationally infeasible. In this paper, we develop a branch and bound approach which is coupled with quick, effective bounds to optimize the movement of a robot which serves the material handling requirements within a manufacturing cell. Computational results are given which explore the tradeoff between computation time and deviation from optimal for different scenarios.

Details

ISSN :
15458830 and 0740817X
Volume :
25
Database :
OpenAIRE
Journal :
IIE Transactions
Accession number :
edsair.doi...........09c69e0fa777bae1d8d887c6fb2e32ab