Back to Search
Start Over
Building Acoustic Engineering
- Publication Year :
- 2022
- Publisher :
- Open Science Framework, 2022.
-
Abstract
- A subject course complied with a grade of 4.0 (A+) approved Doctorate Ph.D. Curriculum Design Subject Course, DBCE 108 3.0 Credit Units Building Acoustic Engineering and as part of my journey at the Atlantic International University with Ph.D. in Building and Construction Engineering. The Gold Line Metro Rail Transit is referred to as the Historic Line that will run approximately from east to west of about 23 km from the Al Aziziya Station, which is adjacent to the Villagio Shopping Mall in the west to the Ras Bu Abboud Station in the east and situated in the heart of Doha City that will become a point of destination in a tranquil environment of connectivity and making them with a perfect place of connectivity in the public domain, which is designed for the community with relations to other landmarks in Doha. The Metro Rail Stations offers great viewpoints for commercial businesses, shelters, and connectivity that will provide connection to the rest of Doha City. However, this is a course study that contains an acoustic screening of the design of the proposed measures for the building acoustic assessment of the public address and the voice alarm system application, building architectural chiller yard, and fencing acoustic system application that includes airborne sound insulation, room acoustics, and noise and vibration control, which is noise acceptable for the Gold Line Metro Rail Transit entrances shelter environment designed for 10 public stations. The proper estimation and simulation using the acoustic 3D modeling software for the Gold Line Metro Rail Transit Shelters with references to the codes and standards of practices which have been shown explain and figure them in this study. The design procedure first starts with the estimation of building acoustic requirements and calculation process that was explained and demonstrated in full detail procedure and was performed obtaining through the software. Based on the design calculation result as discussed in the succeeding Sections which have to be understood by the layman of the application, however, the acoustic equipment was sized and selected based on the requirement. At the start of the design process, the acoustical design has been investigated throughout the architectural perspective according to the requirement of the client for the Sport City Metro Station building, however, the purpose is to secure a sustainable environment within the noise perspective, and acoustic measures which can be used as the design principles in the contribution in the development of the building process.
Details
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........028ee8226ff0706fd4583825b8366cfb
- Full Text :
- https://doi.org/10.17605/osf.io/txq65