GUINEVERE: Construction of a Zero-Power Pb ADS at Mol

Authors :
Billebaud, A.
Baeten, P.
Aït Abderrahim, H.
Ban, G.
Baylac, M.
Bergmans, G.
Bondoux, D.
Bouvier, J.
Chabod, S.
Conto, J. M.
Dessagne, P.
Gaudiot, G.
Gautier, J. M.
Granget, G.
Heitz, G.
Kerveno, M.
Kochetkov, A.
Laune, B.
Lecolley, F. R.
Lecouey, J. L.
Nathalie Marie
Mellier, F.
Merrer, Y.
Nuttin, A.
Reynet, D.
Steckmeyer, J. C.
Vandeplassche, D.
Vermeersch, F.
Vittiglio, G.
Vernay, Emmanuelle
Laboratoire de Physique Subatomique et de Cosmologie (LPSC)
Institut polytechnique de Grenoble - Grenoble Institute of Technology (Grenoble INP )-Institut Polytechnique de Grenoble - Grenoble Institute of Technology-Institut National de Physique Nucléaire et de Physique des Particules du CNRS (IN2P3)-Université Joseph Fourier - Grenoble 1 (UJF)-Centre National de la Recherche Scientifique (CNRS)
Laboratoire de physique corpusculaire de Caen (LPCC)
Université de Caen Normandie (UNICAEN)
Normandie Université (NU)-Normandie Université (NU)-École Nationale Supérieure d'Ingénieurs de Caen (ENSICAEN)
Normandie Université (NU)-Centre National de la Recherche Scientifique (CNRS)-Institut National de Physique Nucléaire et de Physique des Particules du CNRS (IN2P3)
GUINEVERE
Source :
International Topical Meeting on Nuclear Research Applications and Utilization of Accelerators (AccApp'09)-Satellite Meeting European Fast Neutron Transmutation Reactor Projects (MYRRHA/Xt-ADS), International Topical Meeting on Nuclear Research Applications and Utilization of Accelerators (AccApp'09)-Satellite Meeting European Fast Neutron Transmutation Reactor Projects (MYRRHA/Xt-ADS), May 2009, Vienna, Austria, HAL
Publication Year :
2009
Publisher :
HAL CCSD, 2009.

Abstract

International audience; The GUINEVERE project is running since 2007 and is part of the EUROTRANS Integrated Project of the 6th EURATOM Framework Programme. It consists first in the construction of a lead fast ADS mock-up at SCK-CEN Mol (Belgium) for the purpose of ADS subcriticality monitoring experiments, and beyond in support to the design of a Transmutation Experimental Facility (MYRRHA/FASTEF). To do so the VENUS reactor (SCK-CEN) will be coupled with a new GENEPI neutron source under construction by CNRS (France). To accommodate this new source (a 250 keV deuteron accelerator) in a vertical coupling configuration, the VENUS building is being heightened. In parallel the reactor core is being modified to be loaded with fuel assemblies made of enriched Uranium and solid Lead moderator pins, and hold radial and axial Lead reflectors. A new safety and control rod system is also under development. The new GENEPI-3C neutron source is designed to be operated in pulsed mode but also in continuous mode to investigate the current-to-flux reactivity indicator in representative conditions of a powerful ADS. In this latter mode it will be also possible to make short beam interruptions at a fixed frequency to have access to the neutron population decrease as a function of time. The vertical beam line will have the distinctive feature to be retractile, allowing target changing or complete removal (for critical configuration for example). The accelerator will be first completely assembled at LPSC Grenoble for beam characterization before to be transferred in Mol. We will present in this paper the status of this experimental facility assembling, and foreseen experimental programmes in the framework of fast transmutation system studies.

Details

Language :
English
Database :
OpenAIRE
Journal :
International Topical Meeting on Nuclear Research Applications and Utilization of Accelerators (AccApp'09)-Satellite Meeting European Fast Neutron Transmutation Reactor Projects (MYRRHA/Xt-ADS), International Topical Meeting on Nuclear Research Applications and Utilization of Accelerators (AccApp'09)-Satellite Meeting European Fast Neutron Transmutation Reactor Projects (MYRRHA/Xt-ADS), May 2009, Vienna, Austria, HAL