Back to Search
Start Over
Results of the evaluation of the pilot tests:SAFER-LC project Deliverable D4.4
- Source :
- Silla, A, Virtanen, A, Lehtonen, E, Boufidis, N, Salanova Grau, J M, Dressler, A, Grippenkoven, J, Taillandier, V, Khoudour, L, Bakey, C, Garrigos, J, Francoise, C, Jacqueline, D, Antoine, R, Boukour, F, Edelmayer, A, Ruffin, C & Zotos, T 2019, Results of the evaluation of the pilot tests : SAFER-LC project Deliverable D4.4 . SAFER-LC Project . < https://safer-lc.eu/IMG/pdf/saferlc_20191231_d44_v07_vtt_results_of_the_evaluation_of_the_pilot_tests.pdf >
- Publication Year :
- 2019
- Publisher :
- SAFER-LC Project, 2019.
-
Abstract
- This deliverable collects the main results obtained from evaluations of the piloted safety measures selected in earlier phases of the SAFER-LC project. This deliverable reports the descriptions of the piloted measures at railway level crossings, method and data to evaluate the safety effects of the selected measures, as well as the results of evaluations together with their discussion.
- Subjects :
- safety
piloting
assessment
level crossing
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Journal :
- Silla, A, Virtanen, A, Lehtonen, E, Boufidis, N, Salanova Grau, J M, Dressler, A, Grippenkoven, J, Taillandier, V, Khoudour, L, Bakey, C, Garrigos, J, Francoise, C, Jacqueline, D, Antoine, R, Boukour, F, Edelmayer, A, Ruffin, C & Zotos, T 2019, Results of the evaluation of the pilot tests : SAFER-LC project Deliverable D4.4 . SAFER-LC Project . < https://safer-lc.eu/IMG/pdf/saferlc_20191231_d44_v07_vtt_results_of_the_evaluation_of_the_pilot_tests.pdf >
- Accession number :
- edsair.355e65625b88..5c3bf42b2d493ba3d8d255ba10f0fc8d