Cite
Project Scheduling with Resource Constraints Using Branch and Bound Methods
MLA
Willis, R. J., and N. A. J. Hastings. “Project Scheduling with Resource Constraints Using Branch and Bound Methods.” Journal of the Operational Research Society, vol. 27, no. 2, June 1976, pp. 341–49. EBSCOhost, https://doi.org/10.1057/jors.1976.61.
APA
Willis, R. J., & Hastings, N. A. J. (1976). Project Scheduling with Resource Constraints Using Branch and Bound Methods. Journal of the Operational Research Society, 27(2), 341–349. https://doi.org/10.1057/jors.1976.61
Chicago
Willis, R. J., and N. A. J. Hastings. 1976. “Project Scheduling with Resource Constraints Using Branch and Bound Methods.” Journal of the Operational Research Society 27 (2): 341–49. doi:10.1057/jors.1976.61.