Cite
Accelerated bridge construction in Washington State: From research to practice.
MLA
Khaleghi, Bijan, et al. “Accelerated Bridge Construction in Washington State: From Research to Practice.” PCI Journal, vol. 57, no. 4, Fall 2012, pp. 34–49. EBSCOhost, https://doi.org/10.15554/pcij.09012012.34.49.
APA
Khaleghi, B., Schultz, E., Seguirant, S., Marsh, L., Haraldsson, O., Eberhard, M., & Stanton, J. (2012). Accelerated bridge construction in Washington State: From research to practice. PCI Journal, 57(4), 34–49. https://doi.org/10.15554/pcij.09012012.34.49
Chicago
Khaleghi, Bijan, Eric Schultz, Stephen Seguirant, Lee Marsh, Olafur Haraldsson, Marc Eberhard, and John Stanton. 2012. “Accelerated Bridge Construction in Washington State: From Research to Practice.” PCI Journal 57 (4): 34–49. doi:10.15554/pcij.09012012.34.49.