Cite
Temporal variation of suspended sediment load in the Pearl River due to human activities.
MLA
Zhang, Wei, et al. “Temporal Variation of Suspended Sediment Load in the Pearl River Due to Human Activities.” International Journal of Sediment Research, vol. 26, no. 4, Dec. 2011, pp. 487–97. EBSCOhost, https://doi.org/10.1016/S1001-6279(12)60007-9.
APA
Zhang, W., Mu, S., Zhang, Y., & Chen, K. (2011). Temporal variation of suspended sediment load in the Pearl River due to human activities. International Journal of Sediment Research, 26(4), 487–497. https://doi.org/10.1016/S1001-6279(12)60007-9
Chicago
Zhang, Wei, Shousheng Mu, Yanjing Zhang, and Kaimin Chen. 2011. “Temporal Variation of Suspended Sediment Load in the Pearl River Due to Human Activities.” International Journal of Sediment Research 26 (4): 487–97. doi:10.1016/S1001-6279(12)60007-9.