Back to Search Start Over

Planning of CCS development in the Netherlands offshore.

Authors :
Neele, Filip
Wu, Hao
Hendriks, Chris
Brandsma, Ruut
Source :
Energy Procedia; Mar2011, Vol. 4, p2756-2763, 8p
Publication Year :
2011

Abstract

Abstract: The offshore gas fields in The Netherlands provide a storage capacity of about 1 Gt, which will become available over the next few decades. Existing production facilities may be re-used for injection. Uncertainties in storage capacity, injection rates and time of availability require an analysis of the feasibility of storing CO<subscript>2</subscript> at the rates currently projected for the period 2015–2050. This paper investigates the availability of storage capacity and the feasibility of injecting CO<subscript>2</subscript> at the rate that current capture scenarios foresee. The cost of storage in depleted gas fields is estimated, assuming either re-use of existing installations or the construction of new platforms and wells. Unit cost of storage, non-discounted, in the range of 10 € /t CO<subscript>2</subscript> is feasible for larger fields; costs for small fields are estimated to range up to 40 € /t CO<subscript>2</subscript>. Constructing new, dedicated facilities is not always the more expensive option, due to sometimes long hibernation times and higher operational cost of existing facilities. Two capture scenarios are used for the Rotterdam and Amsterdam areas, with captured volumes increasing to 25 Mt/yr or 40 Mt/yr. In both cases, injection rate limitations become apparent when 70–75% of the storage capacity is used, which is around 2055 and 2045, respectively. To ensure continuity of storage, alternatives for storage in offshore gas fields need to be in place by then. [Copyright &y& Elsevier]

Details

Language :
English
ISSN :
18766102
Volume :
4
Database :
Supplemental Index
Journal :
Energy Procedia
Publication Type :
Academic Journal
Accession number :
59802583
Full Text :
https://doi.org/10.1016/j.egypro.2011.02.178