Cite
Heuristic Combined Artificial Neural Networks to Schedule Hybrid Flow Shop with Sequence Dependent Setup Times.
MLA
Wang, Jun, et al. “Heuristic Combined Artificial Neural Networks to Schedule Hybrid Flow Shop with Sequence Dependent Setup Times.” Advances in Neural Networks - ISNN 2005 (9783540259121), 2005, pp. 788–93. EBSCOhost, https://doi.org/10.1007/11427391_126.
APA
Wang, J., Liao, X., Yi, Z., Tang, L., & Zhang, Y. (2005). Heuristic Combined Artificial Neural Networks to Schedule Hybrid Flow Shop with Sequence Dependent Setup Times. In Advances in Neural Networks - ISNN 2005 (9783540259121) (pp. 788–793). https://doi.org/10.1007/11427391_126
Chicago
Wang, Jun, Xiaofeng Liao, Zhang Yi, Lixin Tang, and Yanyan Zhang. 2005. “Heuristic Combined Artificial Neural Networks to Schedule Hybrid Flow Shop with Sequence Dependent Setup Times.” In Advances in Neural Networks - ISNN 2005 (9783540259121), 788–93. doi:10.1007/11427391_126.