Back to Search Start Over

Single- and multi-stage manufacturing systems under imperfect quality items with random defective rate, rework and scrap.

Authors :
Mokhtari, H.
Hasani, A.
Dehnavi-Arani, S.
Source :
Scientia Iranica. Transaction E, Industrial Engineering; Nov/Dec2023, Vol. 30 Issue 6, p2183-2202, 20p
Publication Year :
2023

Abstract

The classical manufacturing systems assume that all produced items are of perfect quality. They also need to consider the rework process in manufacturing operations. Moreover, most of the previous literature considers single-stage production-inventory systems and does not consider multi-stage options. However, in real-world production-inventory systems, defective items are inevitable, and a fraction of the produced items may be defective. In addition, to avoid extra costs and consider environmental issues, organizations tend to rework activities. We propose single and multi-stage production-inventory systems in manufacturing operations where the process is defective, rework is possible, and a percentage of items are scrapped. A main assumption in the current paper is that the defective rate is assumed to be an uncertain parameter. The grey systems theory, as a mathematical tool to address uncertain information in real-world situations, is utilized to model the random defective rate via a grey nonlinear programming problem. The proposed issues are investigated via numerical examples to assess the impact of grey parameters on optimal solutions. [ABSTRACT FROM AUTHOR]

Details

Language :
English
Volume :
30
Issue :
6
Database :
Supplemental Index
Journal :
Scientia Iranica. Transaction E, Industrial Engineering
Publication Type :
Academic Journal
Accession number :
173901278
Full Text :
https://doi.org/10.24200/sci.2021.57129.5078