Back to Search
Start Over
Quay crane scheduling with time windows constraints for automated container port.
- Source :
- Ocean & Coastal Management; Jan2023, Vol. 231, pN.PAG-N.PAG, 1p
- Publication Year :
- 2023
-
Abstract
- The traditional quay crane of the container terminal is gradually transitioning to automation, which significantly changes the loading and unloading operation mode of the quay crane. In this paper, we study the sequence scheduling of automated quay crane (AQC) with time window constraints. First, the process of AQC handling operation is decomposed, and the mechanism model for AQC operation is established. Then, a mixed integer linear programming model is formulated to optimize the scheduling of AQC considering the time window constraints. Finally, the effectiveness of the optimization model is verified by arithmetic examples, and the management insights of energy efficiency optimization of the quay crane scheduling are given through scenario analysis. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 09645691
- Volume :
- 231
- Database :
- Supplemental Index
- Journal :
- Ocean & Coastal Management
- Publication Type :
- Academic Journal
- Accession number :
- 160335742
- Full Text :
- https://doi.org/10.1016/j.ocecoaman.2022.106401