Back to Search Start Over

Waste Management and Disposal Plan in Two Laning with Paved Shoulder of Magadi to near Somwarpeth (Km 51.000 to Km 221.833) of Karnataka State Highway (SH-85), INDIA.

Authors :
Shreyas, A. J.
Anbalagan, C.
Source :
Special Education; 2022, Vol. 1 Issue 43, p10268-10279, 12p
Publication Year :
2022

Abstract

Mainly the Municipal Solid waste, Constructional and Demolition waste is the waste Majorly genearated from the different activities. These waste is an Environmentaly, Socialy, Economically Challenge to Government. This study of Waste Management is to encourage Reduce from Source, Reuse and Recycling of Waste. This Paper refer the recifying the amount of constructional waste produced from the during of highway Construction. The waste which is produced during a Road Construction, Demolision, renovation, realignment activities are called as Constructional Waste. The waste which is produced during Demolision of Existing roads, old minor bridges, is called Demolision Waste. The Contractor will provide separate garbage bins for biodegradable, non-biodegradable and hazardous wastes in the camps and ensure these are regularly emptied and disposed-off in a hygienic manner. So in this paper, describe about Solid waste management in Road construction Camp, office, Material Testing Lab, Highways, Quarrey, Barrow areas. etc. The Management of Construction waste debris as per annexure 8.7. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
13925369
Volume :
1
Issue :
43
Database :
Supplemental Index
Journal :
Special Education
Publication Type :
Academic Journal
Accession number :
159790545