Cite
A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations.
MLA
Kellegöz, Talip, and Bilal Toklu. “A Priority Rule-Based Constructive Heuristic and an Improvement Method for Balancing Assembly Lines with Parallel Multi-Manned Workstations.” International Journal of Production Research, vol. 53, no. 3, Feb. 2015, pp. 736–56. EBSCOhost, https://doi.org/10.1080/00207543.2014.920548.
APA
Kellegöz, T., & Toklu, B. (2015). A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations. International Journal of Production Research, 53(3), 736–756. https://doi.org/10.1080/00207543.2014.920548
Chicago
Kellegöz, Talip, and Bilal Toklu. 2015. “A Priority Rule-Based Constructive Heuristic and an Improvement Method for Balancing Assembly Lines with Parallel Multi-Manned Workstations.” International Journal of Production Research 53 (3): 736–56. doi:10.1080/00207543.2014.920548.