Back to Search
Start Over
Behavioural analysis of a hydroelectric production power plant under reworking scheme.
- Source :
- International Journal of Production Research; Jan2015, Vol. 53 Issue 2, p648-664, 17p, 1 Diagram, 6 Charts, 6 Graphs
- Publication Year :
- 2015
-
Abstract
- By high calibre of the fundamental nature of electric power, both of our economic and personal interests, a system is expected to supply as electrical energy as possible with the highest degree of quality and reliability. This research work aimed to evaluate the reliability measures of a hydroelectric power station. The results of this study are deliberate to provide the improved criteria for upcoming proposals, and serves as a basis for generation expansion planning of hydroelectric power stations. This paper presents a Markov-process based mathematical model for a hydroelectric power plant. The important reliability measures have been derived and discussed with the help of failure and repair rates through the analysis. This research gives a clear view of how the hydropower plants are modelled by defining the states under the failure and repair rates. [ABSTRACT FROM PUBLISHER]
Details
- Language :
- English
- ISSN :
- 00207543
- Volume :
- 53
- Issue :
- 2
- Database :
- Complementary Index
- Journal :
- International Journal of Production Research
- Publication Type :
- Academic Journal
- Accession number :
- 99546444
- Full Text :
- https://doi.org/10.1080/00207543.2014.962114