Cite
Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem.
MLA
Samarghandi, Hamed, et al. “Studying the Effect of Different Combinations of Timetabling with Sequencing Algorithms to Solve the No-Wait Job Shop Scheduling Problem.” International Journal of Production Research, vol. 51, no. 16, Aug. 2013, pp. 4942–65. EBSCOhost, https://doi.org/10.1080/00207543.2013.784410.
APA
Samarghandi, H., ElMekkawy, T., & Ibrahem, A.-M. (2013). Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem. International Journal of Production Research, 51(16), 4942–4965. https://doi.org/10.1080/00207543.2013.784410
Chicago
Samarghandi, Hamed, TarekY. ElMekkawy, and Al-MehdiM. Ibrahem. 2013. “Studying the Effect of Different Combinations of Timetabling with Sequencing Algorithms to Solve the No-Wait Job Shop Scheduling Problem.” International Journal of Production Research 51 (16): 4942–65. doi:10.1080/00207543.2013.784410.