Cite
Minimising earliness and tardiness by integrating production scheduling with shipping information.
MLA
Ma, H. L., et al. “Minimising Earliness and Tardiness by Integrating Production Scheduling with Shipping Information.” International Journal of Production Research, vol. 51, no. 8, Apr. 2013, pp. 2253–67. EBSCOhost, https://doi.org/10.1080/00207543.2012.718452.
APA
Ma, H. L., Chan, F. S., & Chung, S. H. (2013). Minimising earliness and tardiness by integrating production scheduling with shipping information. International Journal of Production Research, 51(8), 2253–2267. https://doi.org/10.1080/00207543.2012.718452
Chicago
Ma, H.L., FelixT.S. Chan, and S.H. Chung. 2013. “Minimising Earliness and Tardiness by Integrating Production Scheduling with Shipping Information.” International Journal of Production Research 51 (8): 2253–67. doi:10.1080/00207543.2012.718452.