Back to Search Start Over

Development and operation of unit 3 at the Kashira GRÉS.

Authors :
Torkhunov, S.
Shvarts, A.
Avrutsky, G.
Verbovetskii, E.
Boksha, A.
Vereshchitin, V.
Somov, A.
Chugreev, A.
Source :
Power Technology & Engineering; Nov2012, Vol. 46 Issue 4, p289-297, 9p
Publication Year :
2012

Abstract

Initial results on the development and operation of the 330 MW pulverized-coal fired unit at the Kashira GRÉS are reported. The major performance indices are close to the design values. The remaining unsolved issues are singled out. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
1570145X
Volume :
46
Issue :
4
Database :
Complementary Index
Journal :
Power Technology & Engineering
Publication Type :
Academic Journal
Accession number :
83587024
Full Text :
https://doi.org/10.1007/s10749-012-0347-4