Back to Search
Start Over
Cyclic scheduling of a robotic flexible cell with load lock and swap.
- Source :
- Journal of Intelligent Manufacturing; Oct2012, Vol. 23 Issue 5, p1885-1891, 7p
- Publication Year :
- 2012
-
Abstract
- In this paper, we study the problem of robotic cell scheduling with m machines with flexibility, load lock and swap assumptions. The robotic cell repetitively produces parts of identical types. We determine the cycle time of all 1-unit cycles in this type of robotic cell and present two new lower bounds for robot move cycles with load lock and swap, either there is flexibility or inflexibility. We also provide a new robot move cycle and prove that it dominates all classical robot move cycles considered in the existing literature of m-machine robotic cells. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 09565515
- Volume :
- 23
- Issue :
- 5
- Database :
- Complementary Index
- Journal :
- Journal of Intelligent Manufacturing
- Publication Type :
- Academic Journal
- Accession number :
- 79959662
- Full Text :
- https://doi.org/10.1007/s10845-011-0505-9