SOLVING THE PROJECT TIME/COST TRADEOFF PROBLEM USING THE MINIMAL CUT CONCEPT.

Authors :
Phillips Jr., Steve
Dessouky, Mohamed I.
Source :
Management Science; Dec1977, Vol. 24 Issue 4, p393-400, 8p
Publication Year :
1977

Abstract

This paper introduces a solution procedure for solving the project time/cost tradeoff problem of reducing a project duration at a minimum cost. The solution to the time/cost problem is achieved by locating a minimal cut in a flow network derived from the original project network. This minimal cut is then utilized to identify the project activities which should experience a duration modification in order to achieve the total project reduction. The paper will document this cut-based procedure and provide a practical application to a project situation. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00251909
Volume :
24
Issue :
4
Database :
Complementary Index
Journal :
Management Science
Publication Type :
Academic Journal
Accession number :
7360742
Full Text :
https://doi.org/10.1287/mnsc.24.4.393