Back to Search
Start Over
Synchronized Scheduling Method in Manufacturing Steel Sheets.
- Source :
- International Transactions in Operational Research; May98, Vol. 5 Issue 3, p189, 11p
- Publication Year :
- 1998
-
Abstract
- An efficient two-stage algorithm has been developed to solve a large-scale multiobjective scheduling problem in steel sheets production. The heuristic algorithm is a blend of operator's know-how and a mathematical solution. The two-stage procedure consists of a rough and detailed scheduling step based on order groping. It enables us to do synchronized scheduling for a multistage manufacturing process as well as to reduce the number of combinations. In addition, the dynamic programming supports efficient calculation. The scheduling system contributes to better-designed schedules and drastic reduction of scheduling time. [ABSTRACT FROM AUTHOR]
- Subjects :
- STEEL industry
MANUFACTURED products
SCHEDULING
Subjects
Details
- Language :
- English
- ISSN :
- 09696016
- Volume :
- 5
- Issue :
- 3
- Database :
- Complementary Index
- Journal :
- International Transactions in Operational Research
- Publication Type :
- Academic Journal
- Accession number :
- 6633214
- Full Text :
- https://doi.org/10.1111/j.1475-3995.1998.tb00114.x