Back to Search
Start Over
Scheduling multi-purpose batch plants with junction constraints.
- Source :
- International Journal of Production Research; Feb1996, Vol. 34 Issue 2, p525, 17p
- Publication Year :
- 1996
-
Abstract
- There is an increasing trend in the chemical process industry to operate flexible batch plants because of their capability to manufacture multiple products simultaneously by sharing the same process resources. In this paper, the scheduling of multi-purpose batch chemical plants with junction (header) constraints is considered. A mixed-integer non-linear model for the scheduling of multi-purpose batch chemical plants is formulated that considers the connection between equipment sets, transfer times, variable batch sizes, alternative process plans, and batch merging. Because of the computational time complexity of the batch scheduling problem, a heuristic scheduling algorithm that minimizes the total tardiness is developed to solve the model. [ABSTRACT FROM AUTHOR]
- Subjects :
- CHEMICAL industry
ECONOMIC lot size
MANUFACTURING processes
Subjects
Details
- Language :
- English
- ISSN :
- 00207543
- Volume :
- 34
- Issue :
- 2
- Database :
- Complementary Index
- Journal :
- International Journal of Production Research
- Publication Type :
- Academic Journal
- Accession number :
- 5791080
- Full Text :
- https://doi.org/10.1080/00207549608904917