Back to Search
Start Over
Improving an Unjustified Common Practice in Ex Post LMP Calculation.
- Source :
- IEEE Transactions on Power Systems; May2010, Vol. 25 Issue 2, p1195-1197, 3p
- Publication Year :
- 2010
-
Abstract
- A common practice for the Ex Post LMP calculation at a number of U.S. ISOs uses a small constant range, typically from -2.0 to +0.1 MW, as each generator's lower and upper bounds. This paper shows that this is an unjustified practice as the marginal units and LMP may change if the bounds are changed. A simple yet effective improvement is proposed. [ABSTRACT FROM AUTHOR]
- Subjects :
- MARGINAL pricing
ENERGY industries
ELECTRIC generators
PRICING
Subjects
Details
- Language :
- English
- ISSN :
- 08858950
- Volume :
- 25
- Issue :
- 2
- Database :
- Complementary Index
- Journal :
- IEEE Transactions on Power Systems
- Publication Type :
- Academic Journal
- Accession number :
- 50995345
- Full Text :
- https://doi.org/10.1109/TPWRS.2009.2037518