Optimization Study on Voltage Level and Transmission Capacity.

Authors :
Zhang Jinhua
Source :
IEEE Transactions on Power Systems; Feb2009, Vol. 24 Issue 1, p193-197, 5p, 1 Black and White Photograph, 8 Charts, 3 Graphs
Publication Year :
2009

Abstract

Jinsha River has very abundant hydro power reservation, ranking first in all the hydro power bases of China. To deliver the 38-GW hydro power from Jinsha power stations by HVDC transmission lines to load centers 1000-2000 km away, it is necessary to determine the right voltage level and the capacity of each bipole. This paper proposes three preliminary power delivery scheme and presents an optimization method for transmission capacity, dc voltage and conductor size. Based on a comprehensive comparison of cost-effectiveness, technical feasibility and network security and stability, it was recommended that the 3 bipolar ±800-kV ultra HVDC (UHVDC) links with rated capacity of 6.4 GW for each link be adopted as transmission scheme of Phase I Hydro Power station on Jinsha River. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
08858950
Volume :
24
Issue :
1
Database :
Complementary Index
Journal :
IEEE Transactions on Power Systems
Publication Type :
Academic Journal
Accession number :
39366332
Full Text :
https://doi.org/10.1109/TPWRS.2008.2008609