Back to Search Start Over

Project Cost Overrun Simulation in Software Product Line Development.

Authors :
Hutchison, David
Kanade, Takeo
Kittler, Josef
Kleinberg, Jon M.
Mattern, Friedemann
Mitchell, John C.
Naor, Moni
Nierstrasz, Oscar
Pandu Rangan, C.
Steffen, Bernhard
Sudan, Madhu
Terzopoulos, Demetri
Tygar, Doug
Vardi, Moshe Y.
Weikum, Gerhard
Münch, Jürgen
Abrahamsson, Pekka
Nonaka, Makoto
Zhu, Liming
Babar, Muhammad Ali
Source :
Product-Focused Software Process Improvement; 2007, p330-344, 15p
Publication Year :
2007

Abstract

The cost of a Software Product Line (SPL) development project sometimes exceeds the initially planned cost, because of requirements volatility and poor quality. In this paper, we propose a cost overrun simulation model for time-boxed SPL development. The model is an enhancement of a previous model, specifically now including: consideration of requirements volatility, consideration of unplanned work for defect correction during product projects, and nominal project cost overrun estimation. The model has been validated through stochastic simulations with fictional SPL project data, by comparing generated unplanned work effort to actual change effort, and by sensitivity analysis. The result shows that the proposed model has reasonable validity to estimate nominal project cost overruns and its variability. Analysis indicates that poor management of requirements and quality will almost double estimation error, for the studied simulation settings. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISBNs :
9783540734598
Database :
Complementary Index
Journal :
Product-Focused Software Process Improvement
Publication Type :
Book
Accession number :
33302345
Full Text :
https://doi.org/10.1007/978-3-540-73460-4_29