Back to Search
Start Over
Force Structure: GAO-08-669T.
- Source :
- GAO Reports; 4/10/208, p1, 23p, 2 Charts
- Publication Year :
- 2008
-
Abstract
- The high pace of overseas operations is taking a heavy toll on Army equipment. Harsh combat and environmental conditions over sustained periods of time have exacerbated equipment repair, replacement, and recapitalization problems. The Army has also taken steps to restructure its forces before implementing its longer term transformation to the Future Combat System. To support ongoing operations and prepare for the future, the Army has embarked on four key initiatives: (1) restructuring from a division-based force to a modular brigade-based force, (2) expanding the Army by adding about 74,000 people and creating new units, (3) repairing, replacing, and recapitalizing new equipment through its reset program, and (4) replacing equipment borrowed from its pre-positioned equipment sets around the world. Since 2004, Congress has provided billions of dollars to support the Army's equipping needs. GAO has issued many reports on the Army's efforts to equip modular units, expand the Army, reset equipment, and manage and replace prepositioned equipment. This statement, which draws largely on these reports, will address (1) the equipment-related cost of these initiatives, and (2) the management challenges facing the Army and the actions needed to improve its implementation of these initiatives. GAO is issuing a separate statement today on the Future Combat System (GAO-08- 638T). Restructuring and rebuilding the Army will require billions of dollars for equipment and take years to complete; however, the total cost is uncertain. Based on GAO's analysis of Army cost estimates and cost data, it appears that the Army's plans to equip modular units, expand the force, reset equipment, and replace prepositioned equipment are likely to cost at least $190 billion dollars through fiscal year 2013. However, these estimates have some limitations and could change. Further, the Army has stated it plans to request additional funds to address equipment shortfalls in modular units through fiscal year 2017. Several factors are contributing to the uncertainties about future costs. First, the Army's $43.6 funding plan for equipping modular units was based on preliminary modular unit designs and did not fully consider the needs of National Guard units. Second, the Army expects to need $18.5 billion for equipment to expand the force but has not clearly documented this estimate. Third, costs to reset equipment may total at least $118 billion from fiscal years 2004-2013 but may change because they are dependent on how much equipment is lost, damaged, or worn beyond repair during continuing operations in Iraq and Afghanistan and how long these operations continue. Fourth, the Army believes it will need at least $10.6 billion to replace pre-positioned equipment that was taken out of storage to support ongoing operations, but this amount is an estimate and DOD's overall strategy for prepositioned equipment has not yet been issued Given the magnitude of these initiatives... [ABSTRACT FROM AUTHOR]
- Subjects :
- ARMIES
RECAPITALIZATION
COST estimates
Subjects
Details
- Language :
- English
- Database :
- Complementary Index
- Journal :
- GAO Reports
- Publication Type :
- Government Document
- Accession number :
- 31693945