Back to Search Start Over

THE SPES DIRECT TARGET PROJECT AT LNL.

Authors :
Gramegn, F.
Andrighetto, A.
Antonucci, C.
Barbui, M.
Biasetto, L.
Bisoffi, G.
Carturan, S.
Celona, L.
Cervellera, F.
Cevolani, S.
Chines, F.
Cinausero, M.
Colombo, P.
Comunian, M.
Cuttone, G.
Dainelli, A.
Di Bernardo, P.
Fagotti, E.
Giacchini, M.
Lollo, M.
Source :
Acta Physica Polonica B; 2007, Vol. 38 Issue 4, p1157-1167, 11p
Publication Year :
2007

Abstract

The SPES Direct Target Project at the Laboratori Nazionali di Legnaro (Italy), devoted to the construction of a Radioactive Ion Beam (RIB) Facility within the framework of the new European RIB panorama, is presented. An innovative configuration for the SPES Project, for the production of neutron-rich exotic nuclei, proposes the use of a primary proton beam (40MeV, 0.2mA), directly impinging on a large Multi-Slice Uranium Carbide Direct Target. The goal is to reach a high number of fission products (up to 10<superscript>13</superscript> fissions/s), still keeping a quite low power deposition inside the target. The description of the overall facility together with details on the Direct Target configuration is presented. Thermo-mechanical calculations, material preparation and characterisation, effusion-diffusion model predictions for the estimation of the release time and total release fraction for different life times and isotopes will be discussed. Finally, a scaled (1:5) prototype of the Target System built to be tested and compared under existing proton beam facilities, will be described. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
05874254
Volume :
38
Issue :
4
Database :
Complementary Index
Journal :
Acta Physica Polonica B
Publication Type :
Academic Journal
Accession number :
24896240