Back to Search Start Over

A Bayesian Dynamic Programming approach to optimal maintenance combined with burn-in.

Authors :
Nicolato, Elisa
Runggaldier, Wolfgang J.
Source :
Annals of Operations Research; 1999, Vol. 91 Issue 1-4, p105-122, 18p, 1 Graph
Publication Year :
1999

Abstract

We consider a complex system consisting of N identical components that are expected to function properly during a given period (mission time). Due to the possibility of failure before completion of the mission time, one allows for maintenance as well as bum-in, the latter in order to cope with the problem of ‘infant mortality’. We present a two-level (Bayesian) Dynamic Programming approach to determine the optimal timing of the maintenance interventions and durations of bum-in, including maintenance-induced bum-in. We also discuss ways to reduce the ‘curse of dimensionality’. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
02545330
Volume :
91
Issue :
1-4
Database :
Complementary Index
Journal :
Annals of Operations Research
Publication Type :
Academic Journal
Accession number :
18662585
Full Text :
https://doi.org/10.1023/A:1018933319826