Back to Search
Start Over
Energy efficient scheduling of a two machine robotic cell producing multiple part types.
- Source :
- Flexible Services & Manufacturing Journal; Dec2024, Vol. 36 Issue 4, p1324-1358, 35p
- Publication Year :
- 2024
-
Abstract
- This paper studies robot speed control decisions and the energy consumption objective in a cyclic robotic cell scheduling problem. The study considers a two-machine flow shop cell that produces multiple part types. A robot handles the parts between the machines and buffers. We assume that the energy consumption of the robot during a move is a convex function of its speed. The problem is to sequence the parts, construct a robot move sequence, and plan the robot's speed levels to minimize two conflicting objectives: cycle time and energy consumption of the robot. We propose mathematical models that find Pareto-efficient solutions to the problem. For large instances, we propose heuristic search algorithms. Numerical results show that integrating robot speed decisions into the scheduling problem leads to significant energy saving. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 19366582
- Volume :
- 36
- Issue :
- 4
- Database :
- Complementary Index
- Journal :
- Flexible Services & Manufacturing Journal
- Publication Type :
- Academic Journal
- Accession number :
- 181254079
- Full Text :
- https://doi.org/10.1007/s10696-023-09528-4