Back to Search Start Over

Two parallel-machine scheduling with maximum waiting time for an emergency job.

Authors :
Jiang, Yiwei
Yuan, Haodong
Zhou, Ping
Cheng, T. C. E.
Ji, Min
Source :
International Journal of Production Research; Aug2024, Vol. 62 Issue 16, p6016-6027, 12p
Publication Year :
2024

Abstract

In modern manufacturing and service industries, urgent orders and service tasks are common, and the speed of handling such urgent tasks is an important indicator of production and service efficiency. In this study, we consider scheduling jobs on two parallel machines with the random arrival of an emergency job. The objective is to minimise the makespan, subject to a given maximum waiting time of the emergency job. We first show that the worst-case ratio of the existing algorithm LPT $ _l $ l -SPT $ _{m-l} $ m − l is at least 3/2 when m = 2. We then analyse some properties of the optimal schedule and derive lower bounds on the optimal makespan. Finally, we present an improved approximation algorithm with a tight worst-case ratio of 4/3. We also provide numerical results showing that our proposed algorithm outperforms algorithm LPT $ _l $ l -SPT $ _{m-l} $ m − l . [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00207543
Volume :
62
Issue :
16
Database :
Complementary Index
Journal :
International Journal of Production Research
Publication Type :
Academic Journal
Accession number :
178298052
Full Text :
https://doi.org/10.1080/00207543.2023.2296024