Cite
Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm.
MLA
Kong, Jili, and Yi Yang. “Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm.” Applied Sciences (2076-3417), vol. 14, no. 10, May 2024, p. 4029. EBSCOhost, https://doi.org/10.3390/app14104029.
APA
Kong, J., & Yang, Y. (2024). Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm. Applied Sciences (2076-3417), 14(10), 4029. https://doi.org/10.3390/app14104029
Chicago
Kong, Jili, and Yi Yang. 2024. “Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm.” Applied Sciences (2076-3417) 14 (10): 4029. doi:10.3390/app14104029.