Back to Search
Start Over
The Problems and Countermeasures of Green all Factor Intelligent Management of Small Hydropower in Guangdong Province.
- Source :
- China Rural Water & Hydropower; 2024, Issue 5, p94-97, 4p
- Publication Year :
- 2024
-
Abstract
- Guangdong Province is rich in rural small hydropower station resources, with nearly 10 000 small hydropower stations in Guangdong Province, ranking first in the country in terms of quantity. Small hydropower station has played an important role in solving rural electricity consumption and promoting rural economic development.However, with the advancement of technology, the adjustment of national industrial policies, and the advancement of ecological civilization construction, small hydropower in Guangdong Province is facing needs such as green transformation and strengthened management. Therefore it is necessary to analyze the problems and countermeasures of small hydropower in green total factor intelligent management. This research shows that small hydropower in Guangdong Province has problems such as hidden dangers in production safety, insufficient protection of ecological flow, low degree of automation in operation and management, and difficulty in supervision. Problems mentioned above can be solved by establishing a safety production standard mechanism, implementing ecological flow, promoting the green transformation of small hydropower, and carrying out all-factor Intelligent management and other measures. [ABSTRACT FROM AUTHOR]
Details
- Language :
- Chinese
- ISSN :
- 10072284
- Issue :
- 5
- Database :
- Complementary Index
- Journal :
- China Rural Water & Hydropower
- Publication Type :
- Academic Journal
- Accession number :
- 177409354
- Full Text :
- https://doi.org/10.12396/znsd.231647