Cite
Optimization of cycle time for loading and hauling trucks in open-pit mining.
MLA
Mnzool, Mohammed, et al. “Optimization of Cycle Time for Loading and Hauling Trucks in Open-Pit Mining.” Mining of Mineral Deposits, vol. 18, no. 1, Jan. 2024, pp. 18–26. EBSCOhost, https://doi.org/10.33271/mining18.01.018.
APA
Mnzool, M., Almujibah, H., Bakri, M., Gaafar, A., Elhassan, A. A. M., & Gomaa, E. (2024). Optimization of cycle time for loading and hauling trucks in open-pit mining. Mining of Mineral Deposits, 18(1), 18–26. https://doi.org/10.33271/mining18.01.018
Chicago
Mnzool, Mohammed, Hamad Almujibah, Mudthir Bakri, Ahmed Gaafar, Adil A. M. Elhassan, and Ehab Gomaa. 2024. “Optimization of Cycle Time for Loading and Hauling Trucks in Open-Pit Mining.” Mining of Mineral Deposits 18 (1): 18–26. doi:10.33271/mining18.01.018.