Back to Search Start Over

Multi-Objective Optimization Flow Shop Scheduling Problem Solving the Makespan and Total Flow Time with Sequence Independent Setup Time.

Authors :
Sadki, Hajar
Aqil, Said
Belabid, Jabrane
Allali, Karam
Source :
Journal of Advanced Manufacturing Systems; Mar2024, Vol. 23 Issue 1, p163-184, 22p
Publication Year :
2024

Abstract

In this paper, a multi-objective permutation flow shop scheduling problem with sequence independent setup time is studied. The bi-objective function that we consider is a linear combination of the makespan and total flow time with a weighted factor for each criterion. We propose a set of exact and approximate methods to minimize the makespan and total flow time in our flow shop optimization problem case. Hence, our main goal is to find the sequence of jobs that minimizes the two criteria of makespan and total flow time. The purpose is to solve this problem, with a mixed integer linear programming model (MILP) and a collection of efficient metaheuristics for different sizes of instances. Moreover, three metaheuristics are used: the Genetic Algorithm (GA), the Iterative Local Search (ILS) algorithm and the Iterated Greedy (IG) algorithm. The three last algorithms GA, ILS and IG are suggested in two ways for exploring the neighborhood. In order to test the efficacy of our resolution approach, different series of instances containing n jobs and m machines are generated randomly ranging from small to relatively large instances. The examination of the suggested simulations allowed us to remark that, for large and medium-scale instances, IG based on the exploration of the neighborhood records the best performances in terms of comparison with the other metaheuristics. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
02196867
Volume :
23
Issue :
1
Database :
Complementary Index
Journal :
Journal of Advanced Manufacturing Systems
Publication Type :
Academic Journal
Accession number :
176363307
Full Text :
https://doi.org/10.1142/S0219686724500070