Back to Search Start Over

Integrated Scheduling of Jobs, Tools, Machines, and Two Different Set of Transbots.

Authors :
Ham, Andy
Park, Myoung-Ju
Fowler, John
Source :
IEEE Transactions on Semiconductor Manufacturing; Feb2024, Vol. 37 Issue 1, p27-37, 11p
Publication Year :
2024

Abstract

This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
08946507
Volume :
37
Issue :
1
Database :
Complementary Index
Journal :
IEEE Transactions on Semiconductor Manufacturing
Publication Type :
Academic Journal
Accession number :
175370959
Full Text :
https://doi.org/10.1109/TSM.2023.3343633