Back to Search
Start Over
Main Delay Factors of Implementation EPC Construction Projects in Iraq.
- Source :
- Journal of Engineering (17264073); Oct2023, Vol. 29 Issue 10, p195-207, 13p
- Publication Year :
- 2023
-
Abstract
- <i>Copyright of Journal of Engineering (17264073) is the property of Republic of Iraq Ministry of Higher Education & Scientific Research (MOHESR) and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
Details
- Language :
- English
- ISSN :
- 17264073
- Volume :
- 29
- Issue :
- 10
- Database :
- Complementary Index
- Journal :
- Journal of Engineering (17264073)
- Publication Type :
- Academic Journal
- Accession number :
- 172901210
- Full Text :
- https://doi.org/10.31026/j.eng.2023.10.12