Cite
BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia's Construction.
MLA
Alnaser, Aljawharah A., et al. “BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia’s Construction.” Buildings (2075-5309), vol. 13, no. 9, Sept. 2023, p. 2267. EBSCOhost, https://doi.org/10.3390/buildings13092267.
APA
Alnaser, A. A., Alsanabani, N. M., & Al-Gahtani, K. S. (2023). BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia’s Construction. Buildings (2075-5309), 13(9), 2267. https://doi.org/10.3390/buildings13092267
Chicago
Alnaser, Aljawharah A., Naif M. Alsanabani, and Khalid S. Al-Gahtani. 2023. “BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia’s Construction.” Buildings (2075-5309) 13 (9): 2267. doi:10.3390/buildings13092267.