Back to Search Start Over

深埋高地应力隧道不同支护时机求解方法对比研究.

Authors :
蒋长伟
陈子全
汪 波
李天胜
周子寒
包烨明
Source :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); 2023, Vol. 43 Issue 1, p119-130, 12p
Publication Year :
2023

Abstract

<i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Details

Language :
Chinese
ISSN :
20964498
Volume :
43
Issue :
1
Database :
Complementary Index
Journal :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
Publication Type :
Academic Journal
Accession number :
164390356