Back to Search
Start Over
Two-Stage Hybrid Optimization Algorithm for Silicon Single Crystal Batch Scheduling Problem under Fuzzy Processing Time.
- Source :
- Mathematical Problems in Engineering; 1/17/2023, p1-14, 14p
- Publication Year :
- 2023
-
Abstract
- Considering the widely existing processing time uncertainty in the real-world production process, this paper constructs a fuzzy mathematical model for the silicon single crystal production batch scheduling problem to minimize the maximum completion time. In this paper, a two-stage hybrid optimization algorithm (TSHOA) is proposed for solving the scheduling model. Firstly, the improved differential evolution algorithm (IDE) is used to solve the order quantity allocation problem of silicon single crystal with different sizes to obtain the quantity of silicon single crystal rods with different sizes produced by different types of single crystal furnaces. Secondly, the variable neighborhood search (VNS) algorithm is adopted to optimize the order quantity sequencingof batch production processes. Finally, simulations and comparisons demonstrate the feasibility of the model and the effectiveness of TSHOA. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 1024123X
- Database :
- Complementary Index
- Journal :
- Mathematical Problems in Engineering
- Publication Type :
- Academic Journal
- Accession number :
- 161345581
- Full Text :
- https://doi.org/10.1155/2023/3816574