Back to Search
Start Over
Study on the Influencing Factors of Investment Return Rate of Waste Incineration Power Generation PPP Project.
- Source :
- Journal of Engineering Management / Gongcheng Guanli Xuebao; 2022, Vol. 36 Issue 6, p084-089, 6p
- Publication Year :
- 2022
-
Abstract
- This research aims to solve the problem of low participation of social capital due to the unreasonable setting of the return on investment of PPP projects in the waste incineration power generation industry. Through literature, cases, and industry characteristics, expert survey method and Fuzzy-DEMATEL method are used to comprehensively identify and optimize the influencing factor system of the return on investment of PPP projects in the waste incineration power generation industry. ANP method is used to evaluate the influencing factors and calculate the factor weight. The results show that key influencing factors such as "project uniqueness" and "government subsidies" should be focused on and controlled. Suggestions such as establishing objective environmental constraints for project uniqueness should be put forward to improve the satisfaction of multiple value subjects and promote the realization of China's "dual carbon" goal. [ABSTRACT FROM AUTHOR]
- Subjects :
- RATE of return
SOCIAL participation
INCINERATION
SUBSIDIES
SATISFACTION
Subjects
Details
- Language :
- Chinese
- ISSN :
- 16748859
- Volume :
- 36
- Issue :
- 6
- Database :
- Complementary Index
- Journal :
- Journal of Engineering Management / Gongcheng Guanli Xuebao
- Publication Type :
- Academic Journal
- Accession number :
- 161340493
- Full Text :
- https://doi.org/10.13991/j.cnki.jem.2022.06.015