Cite
Competitive bi-agent flowshop scheduling to minimise the weighted combination of makespans.
MLA
Bai, Danyu, et al. “Competitive Bi-Agent Flowshop Scheduling to Minimise the Weighted Combination of Makespans.” International Journal of Production Research, vol. 60, no. 22, Nov. 2022, pp. 6750–71. EBSCOhost, https://doi.org/10.1080/00207543.2021.1923854.
APA
Bai, D., Diabat, A., Wang, X., Yang, D., Fu, Y., Zhang, Z.-H., & Wu, C.-C. (2022). Competitive bi-agent flowshop scheduling to minimise the weighted combination of makespans. International Journal of Production Research, 60(22), 6750–6771. https://doi.org/10.1080/00207543.2021.1923854
Chicago
Bai, Danyu, Ali Diabat, Xinyue Wang, Dandan Yang, Yao Fu, Zhi-Hai Zhang, and Chin-Chia Wu. 2022. “Competitive Bi-Agent Flowshop Scheduling to Minimise the Weighted Combination of Makespans.” International Journal of Production Research 60 (22): 6750–71. doi:10.1080/00207543.2021.1923854.