Back to Search Start Over

长节段大吨位预制综合管廊施工工艺研究与应用—以雄安新区装配式综合管廊项目为例.

Authors :
欧阳效勇
霰建平
朱力
单宏伟
王刚锋
Source :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); Aug2022, Vol. 42 Issue 8, p1473-1481, 9p
Publication Year :
2022

Abstract

<i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Details

Language :
Chinese
ISSN :
20964498
Volume :
42
Issue :
8
Database :
Complementary Index
Journal :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
Publication Type :
Academic Journal
Accession number :
159767912
Full Text :
https://doi.org/10.3973/j.issn.2096-4498.2022.08.017