Back to Search
Start Over
长节段大吨位预制综合管廊施工工艺研究与应用—以雄安新区装配式综合管廊项目为例.
- Source :
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); Aug2022, Vol. 42 Issue 8, p1473-1481, 9p
- Publication Year :
- 2022
-
Abstract
- <i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
Details
- Language :
- Chinese
- ISSN :
- 20964498
- Volume :
- 42
- Issue :
- 8
- Database :
- Complementary Index
- Journal :
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
- Publication Type :
- Academic Journal
- Accession number :
- 159767912
- Full Text :
- https://doi.org/10.3973/j.issn.2096-4498.2022.08.017